Directed Electronics D800 Manual de Serviço Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 56
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
3-5
Although we have recommended minimum standards for pipe selection
and installation, the responsibility rests with you to determine whether:
(1) the installation complies with local building codes and standards, (2)
the ground installation is proper for the soil and locale (we recommend
you consult a local structural engineer), and (3) proper precautions have
been taken for lightning and surge protection (see Chapter 4--Lightning
Protection Recommendation).
First determine the total number of modules you are installing:
a. a one-line scoreboard module only for a total of one module. (Example:
Model BA-1, Model FS-1, Model RT-2/4, Model BB-1).
b. a one-line scoreboard module with sponsor panel module for a total of
two modules. (Example: Model BA-1 with SP-E, Model FS-1 with SP-E,
Model RT-2/4 with SP-E, Model BB-1 with SP-E).
c. a two-line scoreboard only for a total of two modules. (Example: Model
BA-2, Model FB-1, Model FB-2, Model TN-1/2).
d. a two-line scoreboard with a sponsor panel for a total of three
modules. (Example: Model BA-2 with SP-D, Model FB-1 with SP-D,
Model FB-2 with SP-D, Model TN-1/2 with SP-B or SP-C).
Figure 15
Note: It is easier to connect the mounting brackets to the pole
keeping them loose, then connect the scoreboard at ground level.
You can then slide the scoreboard and brackets to the needed
height and secure.
You may have to adjust the bottom module after sliding in your
signage to obtain a secure fit.
Table: Pole Placement
(Center to Center)
Step 1
Scoreboard Model Dimension “A”
BA-1, FS-1, BB-1,2,3 7’0”
FB-1, FB-2, BA-2, BA-4 6’0”
P-1, BA-3, RT-1,2, RT-4,5, P-3, P-4 4’0”
TN-1,2, MS-9, MS-12 4’0”
Ground Level
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 55 56

Comentários a estes Manuais

Sem comentários