Figure 14: Pole Mounts
Note: See the Pole Placement Table on the following page for vari-
ous Dimension “A” measurements according to scoreboard model.
Begin by installing your poles. See Figure 14 for specifications.
Note:
1. Owner or contractor must obtain any local permits required
prior to commencing with construction.
2. Prime pipe prior to setting in concrete. Field paint after setting.
3. Concrete shall have a minimum compression strength of 3,000
p.s.i. in 28 days.
4. Pole base holes and mounting poles shall be vertical.
5. The dimensions and specifications shown herein are for score-
boards erected in locations where the following conditions exist:
a. Maximum basic wind speed = 80 M.P.H.
b. Minimum lateral soil bearing capacity = 1,500 P.S.F.
A licensed soils/structural engineer should be consulted when local condi-
tions vary from the above conditions. Wind design shall equal or exceed
sections 2311 in the latest edition of the Uniform Building Code (UBC).
3-4
Mounting Using Pole Mounts
Pole Placement