Directed Electronics equalizer 2500 Guia do Utilizador Página 45

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 44
Load a Flow Cell
HiSeq 2500 System User Guide
35
Load a Flow Cell
Steps to load the clustered flow cell include removing the priming flow cell, cleaning the
flow cell holder, cleaning the flow cell, loading the flow cell, and confirming proper flow.
User-Supplied Consumables
} Lens cleaning tissue
} 70% ethanol or alcohol wipes
} Low-lint lab tissue
} One pair of plastistats
Remove the Used Flow Cell
1 Slowly move the flow cell lever to position 1 to disengage the manifolds.
Figure 16 Flow Cell Lever in Position 1
2 Slowly move the flow cell lever to position 0 to disengage the vacuum seal and release
the flow cell.
Vista de página 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 153 154

Comentários a estes Manuais

Sem comentários