Directed Electronics equalizer 2500 Guia do Utilizador Página 114

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 113
Post-Run Procedures
104
Part # 15035786 Rev. D
Perform a Water Wash
A water wash is required after each sequencing run. After a high output run, you can
perform a maintenance wash instead.
If the instrument has been idle for 1 day or more, perform a water wash before beginning a
new sequencing run.
Illumina-Supplied Consumables
} Laboratory-grade water
User-Supplied Consumables
} 8 bottles, 250 ml (Corning, catalog#430776)
} 10 tubes, 15 ml (Corning, catalog#430052)
} Laboratory-grade water
} [For Rapid Run mode] 1 Eppendorf flip-top tube for each flow cell
Procedure
1 From the Welcome screen, select Wash | Water.
2 Select Yes to wash paired-end reagent positions. Otherwise, select No to wash
SBSreagent positions only. Select Next to proceed.
3 Load the instrument with laboratory-grade water as follows:
a Fill 8 SBSbottles with 20 ml laboratory-grade water.
b Fill 10 PEtubes with 10ml laboratory-grade water.
c [For Rapid Run mode] Fill the Eppendorf tube with 1ml laboratory-grade water.
4 Make sure that a used flow cell is loaded. Load a used flow cell, if necessary. Select
Next.
5 Perform a fluidics check:
a Select solution2 from the drop-down list. Accept the default pump values.
b Select Pump.
c Visually inspect the flow cell for bubbles passing through the lanes and leaks near
the manifolds.
Vista de página 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 153 154

Comentários a estes Manuais

Sem comentários