Directed Electronics 560T Instruções de Operação Página 20

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 96
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 19
SPA 1500
Installation instructions
96106-000-IN Installation instructions.doc
Page 3 of 9
5 HANDLING
All telecommunication equipment shall be treated as ”fragile electronic equipment” and shall
be handled will the utmost care. Any marking on the equipment or instructions following the
equipment shall be adhered to through the entire construction phase.
6 GENERAL EQUIPMENT INSTALLATION
Prior to start of installation of any type of equipment, i.e. central or field, indoor or outdoor, the
following requirements shall be met:
all welding completed,
fixing brackets or plinths complete including all cleaning and painting,
all overhead work completed,
all scaffolding and temporary supports removed to prevent accidental damage,
earth and power available,
all rooms cleaned
All paintwork is completed
Lighting is installed.
Furthermore, for equipment designed for indoor installation, the following additional
requirements shall apply:
Equipment rooms must be protected against ingress of water and dust with entry points
sealed and heating/ventilation provided to maintain a temperature and relative humidity in
accordance with equipment specifications
Unobstructed access to equipment rooms for transport of cabinets/cabinets/ equipment into
the equipment rooms.
Handbook page
18/94
Vista de página 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 95 96

Comentários a estes Manuais

Sem comentários